Place of Origin: | Jiangsu,China |
---|---|
Brand Name: | Ansteel Baostell, Wusteel |
Certification: | ISO9001/CE/SGS |
Model Number: | St45 St52 St20 |
Minimum Order Quantity: | 10Ton |
Price: | Negotiation |
Delivery Time: | 5-8weeks |
Payment Terms: | 30%T/T for deposit, 70% balance before shipment or L/C at sight |
Supply Ability: | 1000 Tons per month |
Name: | St45 St52 Prime Steel St20 Steel Pipe Seamless Tube A53 Carbon Steel Pipe | Type: | Carbon Steel Tubes&pipes |
---|---|---|---|
Application: | Fluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, OIL PIPE, Chemical Fertilizer Pipe, Structure Pipe, Other | Section Shape: | Round |
Outer Diameter: | 23 - 299 Mm | Thickness: | 2.5-7.5mm |
Grade: | 20# 45# 16Mn Q345B Q235B, Carbon | Surface Treatment: | Hot Rolled |
Processing Service: | Welding, Punching, Cutting, Bending, Decoiling | ||
High Light: | SA210 ST12 1 inch carbon steels tube,carbon steel tube for heat exchangers SA210 ST12,SA210 ST12 carbon steel tubes for heat exchanger |
St45 St52 Prime Steel st20 steel pipe Seamless Tube a53 carbon steel pipe
1.Product Description & Packaging & Shipping
St45 St52 Prime Steel st20 steel pipe Seamless Tube a53 carbon steel pipe
Standard | Grade | C max | Mn max | Si max | P | S | Yield strength max | Tensile strength | Elongation% |
DIN17100 | ST52-3 | 0.22 | 1.60 | 0.55 | 0.045 | 0.030 | 345 | 490-630 | 22 |
EN10025 | S355J2 | 0.22 | 1.60 | 0.55 | 0.045 | 0.030 | 255 | 510-680 | 22 |
MATERIAL | ST52,ST52 Hot rolled steel sheet and plate S355JR, S355J0, S275JR, S235JR, SS400, S355JR, A572GR50, AH36, X70, X80, P265GH, 16MO3, 10CRMO910 | ||||||||
WIDTH | 100MM-3500MM, CUT TO SIZE | ||||||||
LENGTH | 100MM-13700MM, CUT TO SIZE | ||||||||
HEAT TREATMENT | NORMALIZED, TEMPERED, CONTROLLED ROLLED |
Outer diameters: | 32mm -720mm |
Wall thickness: | 6mm-800mm |
Length : | 5000mm-13000mm |
Packaging; |
1. by bundles, each bundle weight under 3 tons, for small outer diameter seamless steel pipe, each bundle with 4 - 8 steel strips. 2. after making by bundle, covered with Polyethylene waterproof cloth. 3. make black paints painting on each pipe, then make bundles |
Delivery time; | 7 days for stock sizes, 10-15 days for new production sizes |
Port: | Tianjin China |